Maliru for demolition
The right card on every operative, every day on record.
Demolition is high-risk work done by people with specific tickets on machines that need daily checks. Maliru keeps the job's plans, site checks and photos on one record, and checks every operative's cards before the job is handed over.
No card required · Free forever for 5 users · Every module included
AI and your branding from Team; service contracts and contractor pay on Crew. Compare plans.
What usually goes wrong
- CCDO and CPCS cards checked at the gate, not when the work is planned
- Daily site checks and permits to work on paper that never reach the office
- Machine pre-use checks recorded nowhere anyone can find them
How Maliru fits
- Eligibility — CCDO, CPCS, CSCS and asbestos awareness per operative, checked before work is assigned or at clock-in.
- Inspections — Daily site checks as scored inspections; failed items raise defects tracked to closure.
- Assets — Each machine and attachment with its pre-use checks, custody and certificates.
- Field capture — Progress photos captured against the job, not the camera roll.
- Contract billing — Measures with evidence and invoices built from them; valuations with retention, variations and applications for payment on Crew.

Your board, shaped for demolition
Two workstreams a demolition operation typically runs, with the columns and statuses it would name. Rename anything; import your own sheet and Maliru builds the board from it.
| Job | Client | Stage | Asbestos survey | Status |
|---|---|---|---|---|
| Former depot, Dock Rd | Meridian Utilities | Structure down to slab | Clear | Demolition |
| Garage block, Orchard Close | Kestrel Housing | Strip out | Removal done | Soft strip |
| Old library annexe, Ashdown | Ashdown District Council | Crush and grade | Clear | Clearance |
| Warehouse unit 4, Mill Lane | Northgate Services | Programme agreed | Awaiting survey | Planned |
| Kiosk, Riverside car park | Riverside FM | Complete | Clear | Handed over |
| Site | Client | Check | Checked by | Status |
|---|---|---|---|---|
| Former depot, Dock Rd | Meridian Utilities | Exclusion zone and plant | Supervisor | Completed |
| Garage block, Orchard Close | Kestrel Housing | Hoarding and dust | Supervisor | Completed |
| Old library annexe, Ashdown | Ashdown District Council | Exclusion zone and plant | Supervisor | In progress |
| Warehouse unit 4, Mill Lane | Northgate Services | Hoarding and access | Site manager | Planned |
| Former depot, Dock Rd | Meridian Utilities | Excavator pre-use | Plant operator | Completed |
Questions demolition teams ask
Can we stop an operative without the right card being assigned?
Yes. Record the CCDO card with its levels, and CPCS and asbestos awareness, as credential types and set each to warn or block. The trade pack seeds them as editable starting points.
Where do the demolition plan and surveys live?
Attached to the job, alongside the daily checks and photos. Maliru stores and organises them; it does not write or approve a plan.
Can visitors and subcontractors sign the site rules?
Yes. Send a share pack with your site rules and forms; they read and sign by link and access code without a workspace account.
Also built for
Put your demolition operation on Maliru.
Free for your first five people. Import your job sheet and go.