Maliru for telecoms & fibre
Rollout, splicing and faults, one record per address.
Rollout crews, splicers and fault engineers touch the same addresses in different weeks. Maliru keeps every visit's evidence on the address, hands a day's drops to a crew as one route, and tracks street works permit and ticket expiry.
No card required · Free forever for 5 users · Every module included
AI and your branding from Team; service contracts and contractor pay on Crew. Compare plans.
What usually goes wrong
- Rollout progress reported from three spreadsheets that never agree
- Splice and test evidence lost in phone galleries
- Street works permits and tickets lapsing mid-scheme
How Maliru fits
- Workstreams — Drops, splicing and faults as separate job types, each address a record with its own status and fields.
- Routes — A day's drops handed to one crew as one card, confirmed with one tap, progress back per address.
- Offline capture — Photos and test forms captured in chambers and basements, saved on the device, with sending retried when the app reconnects.
- Permits & credentials — Your own permit types requested from the job, and tickets that warn before they lapse.

Your board, shaped for telecoms & fibre
Two workstreams a telecoms & fibre operation typically runs, with the columns and statuses it would name. Rename anything; import your own sheet and Maliru builds the board from it.
| Address | Client | Drop type | Access notes | Status |
|---|---|---|---|---|
| 4 Larch Way | Northgate Fibre | Overhead | Pole access, no permit | Completed |
| 6 Larch Way | Northgate Fibre | Overhead | Occupier home after 9 | Completed |
| 11 Larch Way | Northgate Fibre | Underground | Chamber in footway | In progress |
| 15 Larch Way | Northgate Fibre | Underground | Key safe, code with office | Planned |
| 2 Fern Court | Northgate Fibre | Overhead | Call ahead | Planned |
| Ticket | Client | Fault | Priority | Status |
|---|---|---|---|---|
| FT-2041 | Northgate Fibre | No light at ONT | P1 | In progress |
| FT-2042 | Meridian Networks | Intermittent loss, cabinet 7 | P2 | Planned |
| FT-2043 | Northgate Fibre | Damaged drop, 9 Mill Lane | P1 | In progress |
| FT-2044 | Kestrel Housing | Splice fault, tray 3 | P2 | To do |
| FT-2039 | Meridian Networks | Duct blockage, Dock Rd | P3 | Completed |
Questions telecoms & fibre teams ask
Can we see progress per address?
Every address is a job with its own status, so the board shows where each one is and the route shows what today's crew has done.
Do test results attach to the address?
Forms with photos, files and signatures attach to the job, so splice and test evidence sits on the address it belongs to.
Do you connect to build-management systems?
Not today. Import your address list from a spreadsheet and Maliru builds the board from it; route and inspection reports export as PDF.
Also built for
Put your telecoms & fibre operation on Maliru.
Free for your first five people. Import your job sheet and go.